{"id":648,"date":"2021-03-22T08:07:16","date_gmt":"2021-03-22T08:07:16","guid":{"rendered":"https:\/\/www.safetymint.com\/blog\/?p=648"},"modified":"2026-02-18T05:10:39","modified_gmt":"2026-02-18T05:10:39","slug":"calculating-roi-on-e-ptw-system","status":"publish","type":"post","link":"https:\/\/www.safetymint.com\/blog\/calculating-roi-on-e-ptw-system\/","title":{"rendered":"Cost Savings \/ RoI Calculator for E-PTW"},"content":{"rendered":"\n<p>Customers often ask us, &#8220;What&#8217;s my RoI in a digitized Permit-to-Work system?&#8221;. Just exactly, how much time and money can be saved by switching to a digitized, <a href=\"https:\/\/www.safetymint.com\/permit-management.htm\" target=\"_blank\" rel=\"noopener\">electronic permit-to-work system (E-PTW)<\/a>. If you are following a paper-based or a standalone XLS or Word Document-based <a href=\"https:\/\/www.safetymint.com\/ptw-meaning.htm\">PTW<\/a> System, then this article may be of help to you.<\/p>\n\n\n\n<p>At Safetymint, we put this to test with our own E-PTW module, and we painted a use-case scenario to compare the time taken. This helped us arrive at the number of man-hours spent &#8211; starting from filling and requesting a <a href=\"https:\/\/www.safetymint.com\/hot-work-permit.htm\">Hot Work Permit<\/a> form to approvals and issuance. This gave us a Time Value of man-hours impacted and saved.<\/p>\n\n\n\n<div class=\"adbanner\">\r\n<a href=\"https:\/\/www.safetymint.com\/request-trial.htm\" target=\"_blank\" rel=\"noopener\">\r\n  <div class=\"row\"> \r\n    <div class=\"col-md-7 col-xs-12 clm1\">\r\n      <h3>Still on a manual Work Permit System?<\/h3>\r\n      <p>Create unilimited checklists. Request, approve &amp; close permits digitally.<\/p>\r\n      <i>Take a free trial<\/i>\r\n    <\/div>\r\n<div class=\"col-md-5 col-xs-12 clm2\">\r\n    <figure><img decoding=\"async\" src=\"https:\/\/www.safetymint.com\/blog\/wp-content\/uploads\/2024\/07\/ad-banner-mobile-tab.png\" alt=\"\"><\/figure><\/div>\r\n  <\/div>\r\n  <\/a>\r\n<\/div>\n\n\n\n<p>We then put a base rate of $10 per man-hour for a contract worker who has been issued a Permit. To arrive at a Money Value of cost savings, we set the number of permits issued per day to 10. You can change the figures in the calculator below to suit your nature of business operations.<\/p>\n\n\n\n<p>We put the math together and you would be surprised with the results. Try the calculator below to check how much you can save every year just by switching to a digital <a href=\"https:\/\/www.safetymint.com\/permit-to-work-system.htm\">Permit to Work system<\/a>.<\/p>\n\n\n\n<div class=\"calc-bg\">\n<h2>Enter the values against each parameter below to calculate total cost savings. You can assume your local currency here.<\/h2>\n<table class=\"calc-post\">\n<tbody>\n<tr>\n<td>A. Enter Total Number of Permits issued per Day :<\/td>\n<td><input id=\"aval\" class=\"postcalc\" maxlength=\"5\" name=\"aval\" type=\"text\" value=\"10\"><\/td>\n<\/tr>\n<tr>\n<td>B. Enter Cost per Man-hour (in your currency) :<\/td>\n<td><input id=\"bval\" class=\"postcalc\" maxlength=\"5\" name=\"bval\" type=\"text\" value=\"10\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"table-two\">\n<p>Time taken from Request to Approval for 1 Permit:<\/p>\n<table class=\"calc-post\">\n<tbody>\n<tr>\n<td>C. With paper-based or existing PTW :<\/td>\n<td><input id=\"cval\" class=\"postcalc\" maxlength=\"5\" name=\"cval\" type=\"text\" value=\"2\"><\/td>\n<\/tr>\n<tr>\n<td>D. Using an E-PTW :<\/td>\n<td><input id=\"dval\" class=\"postcalc\" maxlength=\"5\" name=\"dval\" type=\"text\" value=\" 0.5\"><\/td>\n<\/tr>\n<tr class=\"total-tb\">\n<td><b>Total Cost Savings per Year (in your currency):<\/b><\/td>\n<td><span id=\"fval\">00<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"calc-disc\"><span class=\"\">*<\/span>For more appropriate numbers, you can measure the actual hours spent for one permit in both the paper-based format as well as the digital format, and enter the values above. Try out Safetymint&#8217;s E-PTW module with a <a href=\"https:\/\/www.safetymint.com\/request-trial.htm\" target=\"_blank\" rel=\"noopener\">14-day Free Trial<\/a>.<\/p>\n<p class=\"calc-disc\">The formula used to arrive at the cost savings is simple. Calculate the difference in hours saved between the paper-based and electronic formats. Multiply this with the number of permits per day and cost per hour. Then multiply this with 240 (20 days in a month * 12 months in a year).<\/p>\n<\/div>\n\n\n\n<p>With the Cost Savings above, compare this with the price you pay for your E-PTW system, and you will be able to calculate your RoI. <b>With Safetymint&#8217;s micro-plan, your returns on our E-PTW system is 20x your investment.<\/b><\/p>\n\n\n\n<p>The productive hours lost in a conventional Permit system \u2013 be it paper-based or XLS\/Doc based system \u2013 are due to the following factors \u2026<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Waiting in the queue \u2013 for obtaining forms, approvals<\/li>\n\n\n\n<li>Manual filling of the forms in duplicate or triplicate<\/li>\n\n\n\n<li>Transit time to work location for checklists<\/li>\n\n\n\n<li>Scanning of Permits \u2013 at different stages and emailing them<\/li>\n\n\n\n<li>Communication delays to multiple stakeholders at different stages of the Permit<\/li>\n\n\n\n<li>Preparing a Permit Register<\/li>\n\n\n\n<li>Searching for Permits issued in the past<\/li>\n<\/ol>\n\n\n\n<p>At a base minimum each Permit takes at least 2 hours from request to approvals and actual work getting started, and a maximum of at least 1 day (at organizations where there are multiple levels of approvals required).<\/p>\n\n\n\n<p>Comparing these to a digitized permit system helps us address these pain-points and save hours of productive time, and in turn also save money. By switching to an E-PTW system like Safetymint, you gain by the following advantages \u2026<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Request Permits on-the-go \u2013 from a desktop or mobile<\/li>\n\n\n\n<li>Instant communication \u2013 Alerts and Notifications \u2013 both via Email and In-App Mobile<\/li>\n\n\n\n<li>Customizable <a href=\"https:\/\/www.safetymint.com\/permit-templates\/\">Permit to Work Checklists<\/a><\/li>\n\n\n\n<li>Print to PDF with QR Codes<\/li>\n\n\n\n<li>Automated workflows for instant review and approvals<\/li>\n\n\n\n<li>Automated archival of permits<\/li>\n\n\n\n<li>Search years of data in minutes (even seconds)<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><a href=\"https:\/\/www.safetymint.com\/request-trial.htm\"><img loading=\"lazy\" decoding=\"async\" width=\"730\" height=\"284\" src=\"https:\/\/www.safetymint.com\/blog\/wp-content\/uploads\/2020\/03\/hot-work-permit-banner.png\" alt=\"hot work permit\" class=\"wp-image-1073\" srcset=\"https:\/\/www.safetymint.com\/blog\/wp-content\/uploads\/2020\/03\/hot-work-permit-banner.png 730w, https:\/\/www.safetymint.com\/blog\/wp-content\/uploads\/2020\/03\/hot-work-permit-banner-300x117.png 300w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/a><\/figure>\n<\/div>\n\n\n<p><\/p>\n\n\n\n<p>Hope you found this Cost Savings Calculator useful. You can adopt the same calculator for also measuring your Incident Reporting and Actions Tracker, as well as your periodic Audits and Inspections. Do share with us your thoughts to <a href=\"mailto:info@safetymint.com\">info@safetymint.com<\/a>.<\/p>\n\n\n\n<p>If you would like to talk to us regarding digitizing your permit-to-work system and safety management processes OR are looking to revamp your existing EHS system, you can <a href=\"https:\/\/www.safetymint.com\/contact.htm\" target=\"_blank\" rel=\"noopener\">reach out to us <\/a>or our authorized regional partners.<\/p>\n\n\n\n<p><strong>Related read:<\/strong> Our listing of the <a title=\"best Control of Work software\" href=\"https:\/\/www.safetymint.com\/apps\/best-control-of-work-software.htm\">best Control of Work software<\/a>.<\/p>\n\n\n\n<p>View our following calculators:<br><a href=\"https:\/\/www.safetymint.com\/safety-roi-calculator.htm\" title=\"Safety ROI Calculator\">Safety ROI Calculator<\/a><br><a href=\"https:\/\/www.safetymint.com\/trir-calculator.htm\" title=\"TRIR Calculator\">TRIR Calculator<\/a><br><a href=\"https:\/\/www.safetymint.com\/dart-rate-calculator.htm\" title=\"DART Rate Calculator\">DART Rate Calculator<\/a><\/p>\n\n\n\n<p>Browse our collection of free <a href=\"https:\/\/www.safetymint.com\/permit-templates\/\">permit to work templates<\/a> and <a title=\"Audit and Inspection Checklists\" href=\"https:\/\/www.safetymint.com\/checklists\/\">Audit and Inspection Checklists<\/a> available on the Safetymint app.<\/p>\n\n\n\n<p>Also read: Our article on the <a href=\"https:\/\/www.safetymint.com\/ptw-meaning.htm\">meaning of PTW<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><a href=\"https:\/\/www.safetymint.com\/permit-templates\/\"><img decoding=\"async\" src=\"https:\/\/www.safetymint.com\/images\/general-permit-template-ad.jpg\" alt=\"general work permit template\"\/><\/a><\/figure>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>Customers often ask us, &#8220;What&#8217;s my RoI in a digitized Permit-to-Work system?&#8221;. Just exactly, how much time and money can be saved by switching to a digitized, electronic permit-to-work system (E-PTW). If you are following a paper-based or a standalone XLS or Word Document-based PTW System, then this article may be of help to you. [&hellip;]<!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":8,"featured_media":707,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[389],"tags":[],"class_list":["post-648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-permit-to-work-system"],"aioseo_notices":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/posts\/648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/comments?post=648"}],"version-history":[{"count":74,"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/posts\/648\/revisions"}],"predecessor-version":[{"id":3084,"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/posts\/648\/revisions\/3084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/media\/707"}],"wp:attachment":[{"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/media?parent=648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/categories?post=648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.safetymint.com\/blog\/wp-json\/wp\/v2\/tags?post=648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}